NFPA (Fire) 110 PDF

NFPA (Fire) 110 PDF

Name:
NFPA (Fire) 110 PDF

Published Date:
08/26/2009

Status:
Active

Description:

Standard for Emergency and Standby Power Systems, 2010 Edition

Publisher:
National Fire Protection Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
Codes and standards published by NFPA are displayed as read-only under license from NFPA solely for use within this system. NFPA material may not be downloaded, printed, reproduced, or transferred.

Give facilities reliable auxiliary power on demand with the updated 2010 NFPA 110.

If disruption of the normal utility supply occurs, readiness of emergency power is a key consideration in safeguarding building occupants. NFPA 110: Standard for Emergency and Standby Power Systems covers performance requirements for power systems providing an alternate source of electrical power in the event that the primary power source fails. Power systems covered include power sources, transfer equipment, controls, supervisory equipment, and all related electrical and mechanical auxiliary and accessory equipment needed to supply electrical power to the load terminals of the transfer equipment.

Among the changes in the 2010 edition of NFPA 110 are:
  • Clarification that the Standard is intended to apply to Level 1 or Level 2 emergency power supply systems (EPSSs)
  • Operation testing and routine maintenance provisions cover new and existing EPSSs.
  • Revised definitions of automatic transfer switch and non-automatic transfer switch for consistency with NFPA 111 and correlation with relevant product standards
  • Revised material on Level 1 and Level 2 EPSSs clarifies the function and applicability of each type of system
  • Differentiation of requirements for acceptance testing for new and unoccupied buildings versus those for existing occupied buildings and facilities. In addition, criteria for test duration, step-testing intervals, and required documentation have been modified.
  • Revised rules for operational test durations for diesel and spark-ignited prime movers. Also, the 36 month test requirement has been revised to clarify the maximum duration, the minimum acceptable EPS loading or operating condition, and the method of test initiation.

Number of Pages : 24
Published : 08/26/2009

History

NFPA (Fire) 110
Published Date: 04/08/2021
Standard for Emergency and Standby Power Systems, 2022 Edition
$44.7
NFPA (Fire) 110
Published Date: 09/03/2018
Standard for Emergency and Standby Power Systems, 2019 Edition
NFPA (Fire) 110
Published Date: 06/18/2012
Standard for Emergency and Standby Power Systems, 2013 Edition
NFPA (Fire) 110
Published Date: 08/26/2009
Standard for Emergency and Standby Power Systems, 2010 Edition
NFPA (Fire) 110
Published Date: 04/01/2005
Standard for Emergency and Standby Power Systems, 2005 Edition

Related products

NFPA (Fire) 265
Published Date: 11/29/2022
Standard Methods of Fire Tests for Evaluating Room Fire Growth Contribution of Textile or Expanded Vinyl Wall Coverings on Full Height Panels and Walls, 2023 Edition
$44.7

Best-Selling Products